Skip links

Alesayi Motors

Project Details

Client

Alesayi Trading Cooperation

Location

Tabuk

Year

2016

Land Area

12.700 m2

BUA

5.850 m2

Values

4 Million S.R.

The design scope of work consists of the Face-lifting and renovation of the existing Tabuk facility focusing on Architectural/Interior as well as the engineering assessment of the of the utilities.
Various departments of different space requirements to be analyzed and solutions to be provided to fit into a land location at Tabuk. It is approximately 12000 square meters land as follow:

  • Different entrances and identities area (Branding), for FUSO and Mitsubishi
  • Body shop workshop
  • Spare parts warehouse
  • Display for FUSO and Mitsubishi
  • Sales for FUSO and Mitsubishi
  • Other facilities as per Mitsubishi and FUSO standard provided.
  • Showroom for Rent

Related Projects

Lexus Assembly Building
Marcazi
Naft Gas station
Explore
Drag